Monochrome log
 
 

Knmnyn's pblog

Home

Archives:


This page is powered by Blogger, the easy way to update your web site.

Thursday, August 30, 2001

Adv Basic (cont, Aug) [Jazz moves]
underarm send-out, drop hands
clap, kick-ball change, back 8 counts
forward, monster look, 8 counts
snaps back, 8 count (first 1 should be right arm in, left leg moves, back behind right.
fishtails forward, 8 counts, right side forward.

Wednesday, August 15, 2001

Adv Basic (Aug)
- 1 basic, sub end rock step for slingshot
- quick send out, follower does twist-n-tease
- right side pass
- support follower on first triple
- sub 2nd triple for kick ball change
- right side pass
- turn into left shoulder
- sub rock step for susie q lead (kick + duck stance)
- 8 count susie q around the world
- 6 count susie q, freeze (no table movement): lead out
- and 8 (left, right)
- underarm return

Friday, May 25, 2001

Adv Basic (Apr):
- 2 basics, rotate 180
- send out
- right side pass
- right side pass, catch with opposite
- pivot on rock-step, throw, turn self
- catch left hand
- right side pass
- bump hips on 4th count

Other stuff:
kick ball change
hits

Crash Course (Apr):
- 2 basics
- send out
- behind the back
- she goes, he goes
- j hook return
- send out
- lead low, drop hands
- 6 shimmies, facing, clockwise
- knee clap, clap, hand
- j hook return
- 2 basics
- side by side jig kicks 2
- facing tango style jig kicks 2
- side by side jig kicks 2
- tuck turn, catch opposite hand
- pivot taps (?) 4 sets
- tuck turn
- j hook return

Adv Basic (May):
- 2 jockeys
- 1 basic triple
- tuck turn
- cuddle
- 4 jig kicks forward
- 4 jig kicks back
- side to side cuddle
- 3 jig kicks with big kick
- unfurl
- refurl
- lean on refurl's rock step
- unfurl
- basic, lead down and drop hands
- 3 shimmies, clockwise
- stomp out, back to basic open

Saturday, March 03, 2001

wah, smooth bowl supercracked. Watuza suggests covering it. I think I will try blow drying it.


Wednesday, February 28, 2001

key is definitely to cut a removal edge.
I skipped blow drying on one of them at least.

Tuesday, February 13, 2001

Not using sp really anymore, using casting slip thickness as being a bit thinner than thin glaze.

Cloth 1.5 sp didn't work, would not come off of the cloth.

key seems to be to blow dry it for a while and then cut a definitive edge for the element to crease from.

survived removal:
1.5 sp porcelain, bowl form, 5 min cast, blow dry for 5 minutes until creasing starts.

Monday, January 29, 2001

more results from testing:
1.5 sp porcelain, 2 mins, bowl --> stuck
1.5 sp porcelain, 2 mins, slab --> stuck
trying with cloth, 1.5 sp porcelain.

Thursday, January 25, 2001

contacts are back ordered. Looks like I'll be wearing my epoxy stained glasses for years to come. Wah.

Porcelain casting is in it's first experimental stages.
I'm using 1.5 sg slip cast at 2 minute cast times.
Tray and 2 bowl casts are being dried.

Tuesday, January 23, 2001

stubborness really pays off in the end sometimes, but watching it is sometimes a bit more than you can take.

I wonder when my contacts are going to arrive?

I have to remember to put that ceramics mold book back... Hmm.

Good thing yesterday that I did eventually go to ceramics. It was good to see familiar faces in the studio again. The plaster cast came out much better than I expected it to. Anyways, one more cast to do today and then it's slip time!

Monday, January 22, 2001

Oh, I wanted to remind myself about ceramics configurations for transparent porcelain:

So here is the trials so far:

Medium Time Thickness SG Status
Stoneware: 20 4 mm ?? fired
Stoneware: 5 1 mm ?? fired
Porcelain: 5 crack 1.1 destroyed
Porcelain: 20 3 mm 1.1 green
Porcelain: 5 2 mm 1.1 green

Saturday, January 20, 2001

It's always surprising how fast mood swings can go. I'm at another low point right now after hearing bad news about my immediate career choice.

Negative thought rush in, thinking that the last two years of work has been for naught. I guess I don't understand the community of researchers in my field well at all.

It's unfortunate that this rejection probably nails the coffin lid for the latest one as well. I guess right now I'm taking it pretty badly.

Argh. Bone up a little my friend.

Looking at the future I can see how things get better but the short run shows so little promise that I feel pretty bad.

Hmm.

Friday, January 19, 2001

Gosh I really do miss having Lush to listen to.
Nice and angry. Great for debugging and developing code.

Thursday, January 18, 2001

glug glug water tastes soooo good.
So today Barry came in and the systems went back to hibernation again, just for a little while. Last time Barry came in for over an hour last week, the local system crashed. I should think about plotting the correlation if I can get a little bit more organized.

Okay, I think I got this stuff figured out.
Gosh, lately just a lotta techcoming down the pipe.
Later